Originally Posted by
jazz330
I currently have this issue, I have 2 railway tracks going down a hill that are mounted to a C-channel frame sitting in between a I-Beam. I need to lift the track by 12" as shown in red so I have to have a opening under the rails as shown in yellow. I would have to attach a new structure as shown in green I am not a structural engineer so could someone please give me some ideas. I'm guessing I cant just use 2 pieces of C-channel on each end since that would cause a moment load at the top of the new c-channel. I can mount new parts on the current I-beam or c-channel.
See picture attached.